Consultation

General Contractor · Denpasar, Bali

Building with certainty.

Villas, homes and accommodation across Bali — delivered with the budget open from day one, a schedule that holds, and quality checked before any work is closed up.

Site Experience
15years
Service Area
Bali
Progress Reports
Weekly
Defects Liability
12months
About Us

The company is new. The hands doing the work are not.

For fifteen years we have built renovations, villas and private homes across Bali from the site side — as the people standing on the ground every day, not the ones filing reports from an office. That experience is what we carried into formal incorporation in 2026.

What changed is the structure: binding contracts, documented budgets, and liability that can be enforced. What did not change is the habit of inspecting work on site before it is closed up.

The working principle is single: every quantity, unit price and material specification is written down before work begins — and every change on site is approved in writing before it is carried out.

  1. 2011Began building renovations and homes across Bali as a site foreman.
  2. 2026Formally incorporated as PT Krisinda Bangun Persada, ratified by the Ministry of Law of the Republic of Indonesia.
Indah Supriyatin Owner & Person in Charge, PT Krisinda Bangun Persada
Capabilities

What we build.

Our scope is deliberately narrow. We take on the building types we know thoroughly, rather than every kind of work we could technically enter.

01

Villas & Private Homes

New build Rental & private villas Reinforced concrete structure Landscape & pools
02

Accommodation & Hospitality

Guest houses Small-scale resorts Lodging buildings Service & kitchen areas
03

Renovation & Restoration

Floor additions Structural strengthening Leak remediation Change of use
04

Interiors & Finishing

Interior fit-out Custom furniture Electrical & plumbing Detail finishing
Projects

Work you can verify.

Every project is recorded with its location, floor area, scope and duration — the same record we hand over when a prospective client wants to check it.

No projects added yet. Add them from the Projects menu in the dashboard.

The project list is updated as each job reaches handover. The full record is available on request.

Request the Full Project List
Method

Five stages, one sequence.

The same sequence applies to a small renovation and to a full villa. You always know which stage you are in and what it produces.

  1. 01

    Consultation

    Your needs, the site condition and the budget range are discussed openly. No cost, no obligation.

  2. 02

    Survey & Budget

    Site measurement, then a detailed cost plan broken down by work item, with quantities and specifications.

  3. 03

    Contract

    Scope, materials, payment terms and schedule agreed in writing before work begins.

  4. 04

    Construction

    Regular progress reports with site photographs. Quality checkpoints at every critical stage.

  5. 05

    Handover

    Joint inspection, completion of the defects list, then the maintenance period begins.

Quality & Safety

Checked before it is closed up.

Structural mistakes are almost always found too late — after the render and paint have gone on. We place checkpoints at the stages where they can still be corrected.

A · Quality

Work Checkpoints

Every critical stage is inspected and documented before the next one covers it.

  • Reinforcement before casting
  • Slump and concrete grade at pour
  • Embedded services before rendering
  • Flood testing of wet areas
B · Safety

Site Safety

Sites are run to the same rules whether the job is a small villa or a multi-storey building.

  • Personal protective equipment required on site
  • Scaffolding and edge protection in place
  • Work areas fenced and kept in order
  • Safety briefing before high-risk stages
C · Warranty

After Handover

Our responsibility does not end when the keys change hands.

  • 12-month maintenance period
  • Defects list rectified at no cost
  • As-built documentation handed over
  • Building care guidance
Team

The people responsible.

You will know who holds your project from the first day, and that person does not change halfway through.

No team members yet. Add them from the Team menu in the dashboard.

Company

Registered, and open to checking.

We publish our legal registration openly, because it is the first thing anyone asks for when entrusting a build to someone else.

Service Area

DenpasarBadungGianyarTabanan KlungkungBangliKarangasemBulelengJembrana
Legal Entity
PT Krisinda Bangun Persada
Legal Form
Perseroan Perorangan (individual limited company)
Ratification
Ministry of Law of the Republic of Indonesia, 10 June 2026
Business ID (NIB)
1006260127092
Business Classification
KBLI 41011 · Residential Building Construction
KBLI 41017 · Lodging Building Construction
Domicile
Denpasar City, Bali
Address
Jl. Zamrud II D No. 6, Ubung Kaja,
North Denpasar, Bali 80116

Full legal documentation is available on request for client verification.

Download Company Profile
Frequently Asked

What people ask most.

If your question is not answered here, send it through the form below — we reply with an answer specific to your project.

How long from consultation to breaking ground?
Typically two to four weeks. The site survey happens within days of the consultation, the detailed budget takes one to two weeks depending on complexity, then the contract is signed. We do not start work before the scope and budget are agreed in writing.
How are payments structured?
Payment is split into instalments tied to construction progress, not to the calendar. Each instalment is released after the agreed stage is complete and jointly inspected.
Can you build from another architect's design?
Yes, and it is routine for us. We work from your architect's drawings, prepare the budget against those drawings, and flag anything that needs clarifying before construction starts.
What happens if something changes mid-project?
Every change is written up as a variation, with its effect on cost and schedule stated, and approved in writing before it is carried out.
I live overseas. How do I follow the project?
You receive regular progress reports with site photographs, schedule performance and notes on the week's work. We also take video calls from site.
Contact

Tell us your plan.

Send a short description of the project. We reply within one working day with an initial estimate and a site survey date — at no cost, with no obligation to proceed.

Office
Jl. Zamrud II D No. 6, North Denpasar
Office Hours
Monday–Saturday, 08.00–17.00 WITA
Chat on WhatsApp